Steel Authority of India (SAIL) has supplied 10,500 steel for the 330 Megawatts (MW) Kishanganga Hydroelectric Power Project in Bandipora district of Jammu and Kashmir.
The company stated, “SAIL has supplied more than 50% steel for the Kishanganga Hydroelectric power project, inaugurated by Prime Minister Narendra Modi. SAIL has supplied a total of 10,500 tonnes of steel for the 330 MW hydroelectric project which features three power generating units of 110 MW each.” It has also supplied around 70% of steel for Tuirial Hydroelectric Power Project in Mizoram.
Further, Kishanganga Hydroelectric Power Project was inaugurated by the Prime Minister on Saturday and has also laid down the foundation stone of the Pakal Dul Power Project in Jammu and Kashmir.