Bharat Heavy Electricals Ltd (BHEL) has secured two orders from Telangana State Power Generation Corp (TSPGCL), worth Rs.1,000 crore for supplying emission control equipment.
The company stated, “The orders involve supply and installation of Flue Gas Desulphurization (FGD) systems for control of SOx emissions at TSGENCO’s 1×800 Megawatt (Mw) Kothagudem Thermal Power Station (TPS) and 4×270 MW Bhandradri TPS in Telangana.”
Further, the order also includes modification in Boiler and ElectroStatic Precipitators (ESP) to meet the revised norms.
Read EquityPandit’s Technical Analysis of Nifty Energy Outlook for the Week