L&T Hydrocarbon Engineering (LTHE), in consortium with TechnipFMC has secured two orders from Hindustan Urvarak and Rasayan Limited (HURL), for setting up fertilizers plant .
The EPCC contracts are for for setting up two fertilizer plants of 2,200 TPD Ammonia & 3,850 TPD Urea at Barauni (Bihar) and Sindri (Jharkhand). These plants will be based on ammonia technology of Haldor Topsoe, Denmark and urea technology of Saipem, Italy.
Further, LTHE’s scope of work consists of two 2,200 TPD Ammonia plants and both projects are secured via international competitive bidding, on Lump Sum Turn Key (LSTK) basis and will be executed concurrently.