The Board of NTPC has given its approval for the investment in two solar projects with an estimated cost of Rs 3,104 crore said the Director-Technical at NTPC, AK Jha.
The first project which is situate in Rajasthan, has 260 MW capacity with 4 blocks of 65 MW each.
Whereas the second project that is located in Madhya Pradesh with 5 blocks of 50 MW each.
According to him, both the projects are expected to be commissioned by March 2017.